Short answer: DCR (Domestic Content Requirement) panels use solar cells and modules made in India; non-DCR panels use imported cells. Since 1 June 2026, MNRE's ALMM List-II requires net-metered and open-access projects commissioned on or after that date to use modules from ALMM List-I made with cells from ALMM List-II, unless an exemption applies. Homes claiming the PM Surya Ghar subsidy need DCR panels. Always ask for the module model, the ALMM listing and the DCR certificate before you pay.
DCR vs non-DCR difference at a glance
Cells: DCR (Domestic Content Requirement) panels use solar cells made in India; non-DCR (often written NDCR) panels may use imported cells, even if the panel is assembled in India.
Subsidy: only DCR panels qualify for the PM Surya Ghar home subsidy; non-DCR panels do not.
Price: DCR panels usually cost a few rupees more per watt.
Who uses which: homes claiming the subsidy need DCR; shops, offices and factories (no subsidy) can choose either.
Quality: DCR does not mean better or worse — compare brand, wattage, technology (TOPCon or mono PERC) and warranty separately.
What DCR and non-DCR mean
Solar cells — DCR panels: Made in India; Non-DCR panels: Usually imported
Modules — DCR panels: Assembled in India; Non-DCR panels: Assembled in India or imported
Typical price — DCR panels: Higher; Non-DCR panels: Lower
PM Surya Ghar subsidy — DCR panels: Required; Non-DCR panels: Not eligible
Documentation — DCR panels: DCR certificate traceable to the project; Non-DCR panels: Standard datasheet and warranty
What changed on 1 June 2026: ALMM List-II
The Approved List of Models and Manufacturers (ALMM) has two lists relevant to rooftop buyers:
List-I: approved solar module models and manufacturers
List-II: approved solar cell manufacturers, in force from 1 June 2026
MNRE has stated that net-metering and open-access projects commissioned on or after 1 June 2026 must use modules from List-I with cells from List-II. MNRE refused a blanket extension but allowed some project-specific exemptions for projects that were well advanced before the deadline. It has also issued clarifications for particular categories. For example, residential rooftop projects that do not take the central subsidy were given relief from ALMM List-II until 31 March 2027.
Rules in this area have changed several times in 2026, so check the latest MNRE order for your project category before deciding.
Which panels does your project need?
Home claiming PM Surya Ghar subsidy: DCR panels from ALMM-listed manufacturers
Home not claiming subsidy, net-metered: Check the current ALMM List-II exemption status
Commercial / industrial, net-metered: ALMM List-I modules with List-II cells, unless exempt
Government building rooftop: ALMM List-II applies based on bid and commissioning dates
How to verify your panels
Get the exact module model number in the quote, not just the brand.
Check the ALMM listing for that model on MNRE's published lists.
Ask for the DCR certificate for the supplied modules. It should be traceable to the serial numbers installed on your roof.
Match serial numbers on the panels with the invoice and certificate at handover.
Keep the documents with your warranty file. See plan solar maintenance before the installation.
Why DCR panels cost more
Domestic cell manufacturing capacity is still growing, and DCR panels typically cost more per watt than non-DCR panels. For a subsidised home, the subsidy usually more than offsets this difference. For a commercial site, the requirement depends on whether the project is net-metered and on current exemptions.
DCR, technology and wattage are separate questions
DCR describes where cells are made, not what kind they are. A DCR panel can be mono PERC or TOPCon, monofacial or bifacial, in different wattages. Compare technology, wattage, dimensions and warranty separately. See how to compare two solar quotations.
Frequently asked questions
What is the difference between DCR and non-DCR solar panels?
DCR panels use Indian-made cells and modules and are required for subsidised home systems. Non-DCR panels use imported cells and cost less.
What is ALMM List-II?
MNRE's approved list of solar cell manufacturers. From 1 June 2026, net-metered and open-access projects must use List-I modules made with List-II cells, unless exempt.
Do I need DCR panels for the PM Surya Ghar subsidy?
Yes. Subsidised residential systems must use DCR panels from approved manufacturers.
How can I check if my panels are DCR?
Ask for the DCR certificate for the supplied modules and match it with the serial numbers on your roof and invoice.
Are DCR panels better quality?
Not necessarily. DCR refers to origin, not performance. Compare technology, wattage, efficiency and warranty separately.
Related guides
Which Solar Panels Are Best for a Hyderabad Home? How to Choose Panels and Inverter
TOPCon vs Mono PERC vs Bifacial Solar Panels for Hyderabad Rooftops
Why Solar Subsidy Applications Get Delayed in Telangana (and How to Avoid It)
What Your Solar Installation Contract Should Say: A Hyderabad Checklist
Start here: Hyderabad rooftop solar buyer's guide
Get panels that match your project's rules
Arkasri Energy specifies ALMM-listed panels that match your project's subsidy and net-metering requirements and hands over the DCR documents with serial numbers. See rooftop solar for homes, commercial solar, or book a site assessment.
Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026. Based on MNRE ALMM orders and clarifications issued during 2026; confirm the current order for your project category before purchase.