Make rooftop solar part of a considered plant energy plan. Arkasri Energy specialises in solar projects for pharmaceutical facilities, working with plant engineering and management teams to define the right capacity, installation approach and operating responsibilities.
Understand production and utility demand
Production schedules, HVAC, utilities and auxiliary systems can create different load patterns across the week. Review available interval data and recent bills before setting a solar capacity target. The assessment should distinguish energy charges from fixed or demand charges and identify how much generation can be used on site.
Review industrial roofs in detail
A survey should consider roof condition, structural suitability, corrosion exposure, vents, ducts, shading and maintenance access. Equipment locations and cable routes need to fit the plant’s operating environment. Structural and electrical approvals belong in the design process before materials are ordered.
Coordinate with plant operations
Discuss site induction, permits to work, material movement, restricted areas and available shutdown windows with the plant team. Installation and electrical integration must follow the facility’s approved procedures. The solar scope does not replace the plant’s own quality, safety or regulatory obligations.
Build a proposal for engineering and procurement
Compare the module and inverter specifications, mounting design, monitoring, generation assumptions, maintenance scope and project exclusions. Financing, where requested, depends on lender assessment. Grid connectivity and any export arrangement require the applicable utility approvals; revenue from exported power should not be assumed.
Why rooftop solar suits pharma plants in Telangana
Pharmaceutical units in Genome Valley, Jeedimetla, Pashamylaram, Bollaram and Patancheru run HVAC, clean-room air handling, chillers and utilities through the day, so most rooftop generation is used on site. At LT industrial tariffs of about ₹7.70 per unit — and higher effective costs once demand and other charges are included — every self-consumed unit is a direct saving.
Typical capacity and cost
Most plant roofs we assess support 100 kW to 1 MW. As a guide, a 100 kW rooftop system costs about ₹40–55 lakh in 2026 and generates roughly 400 units a day in Hyderabad conditions. Telangana allows net metering up to 500 kW and gross metering up to 1 MW, with commercial and industrial capacity generally limited to 80% of sanctioned load.
CAPEX or OPEX for pharma companies
Plants that prefer not to tie up capital can choose an OPEX (RESCO) model, paying a fixed tariff per unit for 15–25 years with no upfront cost. CAPEX ownership gives higher lifetime savings and depreciation benefits; we model both for your finance team.
Helpful guides
Frequently asked questions
Is rooftop solar suitable for pharmaceutical plants?
Yes. Pharma plants have steady daytime loads from HVAC and utilities, so rooftop solar is mostly self-consumed. Installation is planned around permits, clean areas and shutdown windows.
How much does a 100 kW solar plant cost for a factory?
About ₹40–55 lakh in 2026, depending on roof type, structure and equipment.
Is there a subsidy for industrial solar in Telangana?
There is no capital subsidy for industrial rooftop solar; savings come from avoided grid purchases. Ask your tax adviser about depreciation benefits.
Will installation disturb production?
Most work happens on the roof. Electrical integration needs a short, planned shutdown that we schedule with your engineering team.