Commercial & Industrial Rooftop Solar in Hyderabad
Use your building’s roof to support its daytime electricity needs. Arkasri Energy plans and installs commercial and industrial rooftop solar systems for offices, warehouses, institutions and manufacturing facilities.
Size for energy use and site constraints
Roof area, sanctioned load, operating hours and daytime consumption all affect the proposed system. We begin with bills and a site survey, then identify a practical capacity and layout. Future loads can be discussed before the system is designed.
Specify a complete project scope
A solar EPC proposal should describe engineering, procurement and construction clearly. Ask for module and inverter details, mounting arrangements, electrical protection, cable routes, monitoring and the responsibilities for utility applications and inspections.
Evaluate savings with the right tariff
Commercial electricity charges may include energy, fixed and demand components. A useful savings estimate separates these and states assumptions for self-consumption and any approved export settlement. System output is not the same as a guaranteed reduction in the total electricity bill.
Plan for long-term operation
Cleaning access, generation monitoring, warranty records and service responsibilities should be agreed before handover. A clear maintenance scope makes it easier for your facilities team to manage the system after installation.
Commercial and industrial solar cost in Hyderabad
Indicative 2026 prices for rooftop systems: 50 kW about ₹22–28 lakh and 100 kW about ₹40–55 lakh, depending on the structure, module and inverter selection and cable distances. The PM Surya Ghar subsidy applies to residential connections only, so commercial projects are evaluated on electricity savings, payback and, where relevant, accelerated depreciation advice from your tax adviser.
How much can a business save?
Commercial (LT-II) consumers in Telangana pay roughly ₹8.50–11 per unit and LT industrial consumers about ₹7.70 per unit under the TGERC FY2026-27 tariff. Every unit generated and used on site avoids that charge, so businesses with daytime loads — offices, schools, hospitals, showrooms, warehouses and factories — usually see the fastest payback. Exported surplus is settled at a much lower rate (₹2.57 per unit for net-metered consumers), so we size systems for self-consumption.
Net metering, gross metering and approvals
In Telangana, rooftop systems up to 500 kW can use net metering and up to 1 MW gross metering, and commercial and industrial capacity is generally limited to 80% of the sanctioned load. We prepare the TGSPDCL application, single-line diagram and test reports, and coordinate inspection and meter installation.
CAPEX or OPEX (RESCO)
With CAPEX you own the plant and keep all the savings. With OPEX, a developer invests and you pay a fixed tariff per unit generated, usually below your grid tariff, with no upfront cost. We help you compare both on a 25-year cash-flow basis.
Industries and areas we serve
Offices and IT buildings, schools and colleges, hospitals and clinics, hotels, showrooms, shopping complexes, warehouses and cold storage, pharma units and manufacturing plants across Hyderabad, including Patancheru, Bollaram, Jeedimetla, Cherlapally, Kattedan, Balanagar, Shamshabad and the wider Rangareddy, Medchal and Sangareddy districts.
Helpful guides
Frequently asked questions
What is the cost of a 50 kW solar system in Hyderabad?
A 50 kW commercial rooftop system typically costs about ₹22–28 lakh in 2026, depending on structure height, equipment and cable runs.
Is there a subsidy for commercial solar in Telangana?
No. The PM Surya Ghar subsidy covers residential connections only. Businesses benefit from tariff savings and should ask their tax adviser about depreciation benefits.
What is the payback period for commercial solar?
For businesses paying ₹8.50–11 per unit with good daytime use, payback is commonly 3–5 years; it depends on tariff, self-consumption and system cost.
How long does a commercial solar project take?
A 50–100 kW rooftop project usually takes 6–10 weeks from survey to commissioning, including TGSPDCL approvals.
Can solar reduce demand charges?
Solar mainly reduces energy charges. It can lower demand charges only when the peak demand coincides with strong solar generation; a load study shows how much.