Short answer: PM-KUSUM Component A supports decentralised ground- or stilt-mounted solar plants set up by farmers (individually or in groups) on their own land, with the power sold to the DISCOM. Component C solarises existing grid-connected agricultural pumps, either pump by pump (individual pump solarisation) or by solarising an entire agricultural feeder (feeder-level solarisation). MNRE has extended financial closure for Components A and C to 30 November 2026 and set 31 March 2027 as the final completion date, while a PM-KUSUM 2.0 is being prepared, so check current status before planning.
The three components at a glance
Component A: decentralised grid-connected renewable power plants on farmers' land, selling power to the DISCOM
Component B: stand-alone solar pumps in off-grid areas
Component C: solarisation of grid-connected agricultural pumps, including feeder-level solarisation
Component A: farmer-owned solar plants
Plants are set up on farmers' own land, by the farmer, a group of farmers, cooperatives, panchayats or farmer producer organisations, or through a developer on leased land
Scheme guidelines target small plants, typically in the 500 kW to 2 MW range, located near a substation
Power is sold to the DISCOM under a long-term PPA at a tariff set under the scheme
Key checks: land title, distance to the substation, substation capacity and DISCOM allocation
See 1 MW solar plant feasibility for land and grid checks.
Component C: pump and feeder solarisation
Individual pump solarisation (IPS): a solar array is added to an existing grid-connected pump; the farmer can use solar power for irrigation and sell surplus to the DISCOM
Feeder-level solarisation (FLS): a solar plant supplies an entire agricultural feeder, usually developed through the DISCOM or state agency
Financial support is shared between central assistance, state support and the beneficiary, as set by the scheme and state
Key differences
Purpose: A generates power for sale; C reduces grid power used by pumps
Location: A uses available land near a substation; C is tied to pump or feeder locations
Who benefits: A gives landowners a long-term income; C lowers irrigation power costs and can give surplus income
Who implements: both run through state implementing agencies and DISCOMs
Timelines in 2026–27
MNRE extended the financial closure deadline for Components A and C to 30 November 2026
Project completion is due by 31 March 2027, with MNRE stating no further extension
Earlier in 2026, MNRE said it was finalising details of PM-KUSUM 2.0
New projects may depend on PM-KUSUM 2.0 rules. Check with TGREDCO (Telangana) or NREDCAP (Andhra Pradesh) and your DISCOM before committing land or money.
Frequently asked questions
What is the difference between PM-KUSUM Component A and C?
Component A is for farmer-owned solar plants that sell power to the DISCOM. Component C solarises existing grid-connected pumps or whole agricultural feeders.
Who can apply under PM-KUSUM Component A?
Farmers, groups of farmers, cooperatives, panchayats and farmer producer organisations, directly or through developers on their land.
What is feeder-level solarisation?
A solar plant that supplies an entire agricultural feeder instead of individual pumps.
What is the PM-KUSUM deadline?
Financial closure for Components A and C by 30 November 2026 and completion by 31 March 2027, according to MNRE's 2026 orders.
Is PM-KUSUM available in Telangana and Andhra Pradesh?
Availability depends on state allocations and implementing agencies. Check with TGREDCO, NREDCAP and your DISCOM.
Related guides
1 MW Solar Plant Feasibility in Telangana and Andhra Pradesh: Land, Grid, Buyer and Cost Drivers
Solar EPC Tender Checklist for Hyderabad Businesses and Institutions
CAPEX vs OPEX vs RESCO Solar: Which Model Suits Your Business?
End-to-End Solar in Hyderabad: Who Handles Each Stage, From Survey to Handover
Start here: Hyderabad rooftop solar buyer's guide
Plan a ground-mounted project with Arkasri
Arkasri Energy provides EPC for ground-mounted solar in Telangana and Andhra Pradesh, starting with land, grid and scheme feasibility. See ground-mounted solar or book a project assessment.
Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026. Based on MNRE PM-KUSUM guidelines and 2026 timeline orders; scheme terms change, so verify with official sources.