Short answer: PM-KUSUM Component A supports decentralised ground- or stilt-mounted solar plants set up by farmers (individually or in groups) on their own land, with the power sold to the DISCOM. Component C solarises existing grid-connected agricultural pumps, either pump by pump (individual pump solarisation) or by solarising an entire agricultural feeder (feeder-level solarisation). MNRE has extended financial closure for Components A and C to 30 November 2026 and set 31 March 2027 as the final completion date, while a PM-KUSUM 2.0 is being prepared, so check current status before planning.

The three components at a glance

  • Component A: decentralised grid-connected renewable power plants on farmers' land, selling power to the DISCOM

  • Component B: stand-alone solar pumps in off-grid areas

  • Component C: solarisation of grid-connected agricultural pumps, including feeder-level solarisation

Component A: farmer-owned solar plants

  • Plants are set up on farmers' own land, by the farmer, a group of farmers, cooperatives, panchayats or farmer producer organisations, or through a developer on leased land

  • Scheme guidelines target small plants, typically in the 500 kW to 2 MW range, located near a substation

  • Power is sold to the DISCOM under a long-term PPA at a tariff set under the scheme

  • Key checks: land title, distance to the substation, substation capacity and DISCOM allocation

See 1 MW solar plant feasibility for land and grid checks.

Component C: pump and feeder solarisation

  • Individual pump solarisation (IPS): a solar array is added to an existing grid-connected pump; the farmer can use solar power for irrigation and sell surplus to the DISCOM

  • Feeder-level solarisation (FLS): a solar plant supplies an entire agricultural feeder, usually developed through the DISCOM or state agency

  • Financial support is shared between central assistance, state support and the beneficiary, as set by the scheme and state

Key differences

  • Purpose: A generates power for sale; C reduces grid power used by pumps

  • Location: A uses available land near a substation; C is tied to pump or feeder locations

  • Who benefits: A gives landowners a long-term income; C lowers irrigation power costs and can give surplus income

  • Who implements: both run through state implementing agencies and DISCOMs

Timelines in 2026–27

  • MNRE extended the financial closure deadline for Components A and C to 30 November 2026

  • Project completion is due by 31 March 2027, with MNRE stating no further extension

  • Earlier in 2026, MNRE said it was finalising details of PM-KUSUM 2.0

New projects may depend on PM-KUSUM 2.0 rules. Check with TGREDCO (Telangana) or NREDCAP (Andhra Pradesh) and your DISCOM before committing land or money.

Frequently asked questions

What is the difference between PM-KUSUM Component A and C?

Component A is for farmer-owned solar plants that sell power to the DISCOM. Component C solarises existing grid-connected pumps or whole agricultural feeders.

Who can apply under PM-KUSUM Component A?

Farmers, groups of farmers, cooperatives, panchayats and farmer producer organisations, directly or through developers on their land.

What is feeder-level solarisation?

A solar plant that supplies an entire agricultural feeder instead of individual pumps.

What is the PM-KUSUM deadline?

Financial closure for Components A and C by 30 November 2026 and completion by 31 March 2027, according to MNRE's 2026 orders.

Is PM-KUSUM available in Telangana and Andhra Pradesh?

Availability depends on state allocations and implementing agencies. Check with TGREDCO, NREDCAP and your DISCOM.

Related guides

Plan a ground-mounted project with Arkasri

Arkasri Energy provides EPC for ground-mounted solar in Telangana and Andhra Pradesh, starting with land, grid and scheme feasibility. See ground-mounted solar or book a project assessment.

Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026. Based on MNRE PM-KUSUM guidelines and 2026 timeline orders; scheme terms change, so verify with official sources.