Short answer: A 100 kW rooftop solar plant in Telangana typically costs about ₹40–55 lakh turnkey in 2026 (₹40,000–55,000 per kW, indicative). It generates about 400–450 units a day, or 1.4–1.6 lakh units a year, and needs roughly 8,000–10,000 sq ft of shade-free roof. Factories and commercial buildings get no PM Surya Ghar subsidy; housing societies get ₹18,000 per kW for common facilities. At Telangana industrial and commercial tariffs, payback is usually 3.5–5 years.

Quick facts: 100 kW solar in Telangana

  • Indicative cost: ₹40–55 lakh, depending on roof type, structure, panels and inverters.

  • Generation: about 400–450 units a day; 1.4–1.6 lakh units a year.

  • Roof: about 8,000–10,000 sq ft shade-free; metal sheds need a structural check.

  • Panels: about 175–185 panels of 545–580 Wp.

  • Inverters: typically two 50 kW or four to five 20–25 kW string inverters.

  • Load rule: commercial and industrial systems up to 80% of sanctioned load or contracted demand, so 100 kW needs about 125 kW or more.

  • Metering: net metering up to 500 kWp under TGERC Regulation No. 1 of 2025.

Cost breakdown (typical shares)

  • Panels: about 40–50%. Non-DCR panels are allowed without a subsidy and are usually cheaper.

  • Inverters: about 8–12%.

  • Structure: about 10–15% (more for elevated RCC structures, less for sheet roofs).

  • Cables, ACDB/DCDB, earthing, protection and monitoring: about 10–15%.

  • Design, installation, liaison and commissioning: about 10–15%.

Use our EPC tender checklist to get comparable bids.

Who installs 100 kW in Telangana?

Savings and payback

  • LT-III industry at ₹7.70 per unit: 1.4–1.6 lakh units save roughly ₹10.5–12 lakh a year.

  • Commercial LT-II at ₹9.90–11: savings can reach ₹14–17 lakh a year if most power is used on site.

  • HT consumers: energy is billed per kVAh with demand charges and Time-of-Day surcharges; TGERC raised the peak-hour ToD surcharge to ₹1.50 per unit for 2026-27. Solar mainly reduces energy charges; see solar and demand charges.

  • Payback: about 3.5–5 years; panels are warranted for 25+ years.

Surplus exported beyond your consumption is settled at ₹2.57 per unit, so match the plant to your daytime load. If you run on Sundays or holidays with low load, model that carefully. See net vs gross metering.

100 kW for housing societies

Group housing societies and RWAs can claim ₹18,000 per kW under PM Surya Ghar for common facilities, so a 100 kW society system can receive up to ₹18 lakh, subject to the scheme's per-house cap. See solar for apartments and gated communities and how RWAs compare solar proposals.

CAPEX or RESCO?

Owning the plant gives the highest return; a RESCO/PPA model avoids upfront spend in exchange for a per-unit tariff over 15–25 years. See CAPEX vs OPEX solar.

Frequently asked questions

What is the cost of a 100 kW solar plant in Telangana?

About ₹40–55 lakh turnkey in 2026, indicative.

How many units does a 100 kW plant generate per day?

About 400–450 units a day in Telangana conditions.

How much roof is needed for 100 kW?

About 8,000–10,000 sq ft of shade-free roof.

Is there a subsidy for 100 kW commercial solar?

No PM Surya Ghar subsidy for businesses; RWAs get ₹18,000 per kW for common facilities.

Can a 100 kW plant use net metering in Telangana?

Yes, net metering is allowed up to 500 kWp, within 80% of sanctioned load for C&I users.

What is the payback period?

Usually 3.5–5 years depending on tariff and self-consumption.

Sources

  • TGERC Regulation No. 1 of 2025 (net metering up to 500 kWp; 80% limit).

  • TGERC Retail Supply Tariff Schedule FY 2026-27.

  • The Hans India, 2026: no tariff hike and higher ToD surcharge for 2026-27.

  • PM Surya Ghar Muft Bijli Yojana (GHS/RWA support).

For shops, offices, schools and factories, see our commercial and industrial rooftop solar service in Hyderabad — load study, design, EPC and net or gross metering under one contract.

Running a pharmaceutical or bulk-drug unit? See our solar company service for pharma plants in Telangana — plant load study, roof survey, shutdown-friendly installation and net or gross metering.

Related guides

Plan a 100 kW plant

We provide a structural check, generation model and itemised EPC proposal. Talk to our commercial team.

Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026. Costs are indicative market ranges; your proposal will be itemised for your site.