Short answer: An RWA should compare solar proposals on the same basis: system size based on 12 months of common-area bills, identical scope (panels, inverter, structure, protection, net metering), the PM Surya Ghar RWA subsidy shown separately, maintenance and monitoring for at least the first years, and lifecycle cost rather than just the upfront price. Ask every vendor to fill in the same comparison sheet, and present the result to the general body with clear responsibilities.

Step 1: Agree the brief before inviting quotes

  • Which connections the system will serve (common-area meters only, or more)

  • 12 months of bills and sanctioned load for each common connection

  • Terrace areas available, and areas residents want kept free

  • Structure height preference (low or elevated)

  • Budget source: corpus fund, special levy or a CAPEX/OPEX model. See CAPEX vs OPEX vs RESCO

Sharing the same brief with every vendor makes proposals comparable.

Step 2: Compare the technical scope

  • DC capacity (kWp) and inverter rating (kW). See kW vs kWp

  • Panel make, model and ALMM/DCR status. See DCR vs non-DCR

  • Structure material, height and wind design

  • Protection equipment listed item by item. See protection equipment explained

  • Monitoring access for the facility manager and committee

Step 3: Compare subsidy and paperwork

  • Under PM Surya Ghar, group housing societies and RWAs can receive ₹18,000 per kW for common facilities, including EV charging, up to 500 kW, calculated at 3 kW per house. Check current rules on the official portal.

  • Who prepares the society resolution, portal registration and DISCOM application

  • Whether the proposal shows the full price before subsidy and the expected subsidy separately

  • Net metering, inspection and, where applicable, electrical inspectorate certification

Step 4: Compare savings assumptions

  • Expected annual generation and the assumptions used

  • Share of solar used directly by daytime loads (pumps, lifts, STP)

  • Surplus export and how it is valued. See generation vs savings

  • Fixed charges that will not change

Step 5: Compare lifecycle cost

  • Annual maintenance cost and what it includes (cleaning, inspections, inverter checks)

  • Inverter warranty and likely replacement during the system's life

  • Workmanship warranty and response time

  • Insurance, if the society wants it

Step 6: Present to the general body

  • One-page summary: size, cost, subsidy, expected savings and payback

  • Comparison table of all proposals on the same scope

  • Who maintains the system and how residents can see performance

  • Resolution text authorising the committee and signatory

Frequently asked questions

How should an RWA choose a solar vendor?

Give all vendors the same brief, compare identical scope item by item, and weigh maintenance and warranties along with price.

What subsidy can an RWA get for solar?

Under current PM Surya Ghar rules, ₹18,000 per kW for common facilities, up to 500 kW, calculated at 3 kW per house.

Does an RWA need general body approval for solar?

Usually yes, because it uses common property and funds. Follow your society's bylaws.

What loads should RWA solar power?

Common-area loads such as lifts, water pumps, STP, lighting and clubhouse, especially those used in daytime.

Should the RWA choose CAPEX or OPEX?

CAPEX usually gives more savings; OPEX avoids upfront cost. Compare both on lifecycle cost and contract terms.

Related guides

Get a proposal you can compare

Arkasri Energy prepares itemised proposals for Hyderabad RWAs and gated communities, with the subsidy shown separately and a one-page summary for the general body. See our apartment solar guide or book a site assessment.

Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026. Confirm subsidy rules on the official PM Surya Ghar portal.