Short answer: Net metering in Telangana lets you export surplus solar power to the grid and offset it against the units you import. Since 15 November 2025, the TGERC rooftop solar regulation allows net metering up to 500 kWp. Homes can install up to their full sanctioned load, while commercial and industrial consumers are limited to 80% of it. In Hyderabad, you apply to TGSPDCL. The application fee is ₹2,500 for low-tension connections, and the DISCOM has 15 working days to issue feasibility once your application is complete.

What changed in 2025: the new TGERC rooftop solar regulation

The Telangana Electricity Regulatory Commission (TGERC) replaced the 2016 net metering regulation and its 2021 amendment with a new rooftop solar regulation. It came into force on 15 November 2025. The main points for homes and businesses in Hyderabad:

  • Capacity: net metering is available up to 500 kWp for all eligible categories except temporary supply. Gross metering is available up to 1 MWp.

  • Sanctioned load: residential and government consumers can install up to 100% of their sanctioned load. Industrial, commercial and other consumers can install up to 80%.

  • Surplus energy: if you export more than you import, the surplus is settled at the lowest solar tariff discovered by the state DISCOMs in the previous financial year, not at your retail tariff.

  • Fees: ₹2,500 application fee for low-tension (LT) consumers and ₹15,000 for high-tension (HT) consumers.

  • Feasibility: the DISCOM must issue feasibility within 15 working days of a complete application. Systems up to 10 kWp do not need a technical feasibility study.

  • Safety approval: systems above 56 kWp need insurance and certification by the Chief Electrical Inspector. Smaller systems can be self-certified.

  • Validity: the arrangement is valid for 25 years from grid connection, and new connections use smart meters.

The regulation also introduces group net metering and virtual net metering for systems below 100 kWp, which matters for apartments and gated communities. See our guide to rooftop solar for apartments and gated communities.

Net metering vs gross metering: which suits you?

  • Net metering: you use your solar power first and only the difference is billed. This suits almost every home, school, hospital and business that consumes most of its solar power on site.

  • Gross metering: the DISCOM buys all the power you generate at the discovered solar tariff, and you pay your normal tariff for everything you consume. This rarely suits a consumer whose tariff is higher than the buying rate.

Because surplus exports earn far less than the tariff you pay, the best value comes from sizing the system to the electricity you actually use, not from filling the whole roof. Our guide on how solar savings are estimated explains why self-use matters.

Step-by-step: getting a net meter from TGSPDCL in Hyderabad

  1. Check your bill and sanctioned load. The system cannot exceed your sanctioned load (80% for commercial and industrial). If it is too low, apply for a load enhancement first.

  2. Get a site survey and design. Your installer confirms roof space, shading and the system size that fits your consumption.

  3. Apply. Homes claiming the subsidy apply through the PM Surya Ghar portal, selecting Telangana and TGSPDCL. Other consumers apply to TGSPDCL with the net-metering application.

  4. Feasibility approval. TGSPDCL checks transformer or feeder capacity and your documents. The DISCOM has 15 working days once the application is complete.

  5. Installation. A typical home system takes 2–4 days to install once materials arrive.

  6. Inspection and net meter. The installer submits commissioning documents. TGSPDCL inspects the system and installs the bidirectional smart meter.

  7. Subsidy (homes only). After commissioning is approved on the portal, the PM Surya Ghar subsidy is paid directly to your bank account.

Installers in Hyderabad report that the whole process takes about two to three months for a home system. Delays usually come from name mismatches between the bill, Aadhaar and bank account, or missing documents.

Documents you will need

  • Latest electricity bill with your service connection (USC) number

  • Aadhaar card, with the name matching the bill

  • Cancelled cheque or bank passbook page

  • Proof of ownership, such as a property tax receipt or sale deed

  • For flats and gated communities: a no-objection certificate from the society or RWA

  • Roof photographs and the installer's single-line diagram and equipment details

Common mistakes that delay approval

  • Choosing a system larger than the sanctioned load allows

  • A different name on the electricity bill, Aadhaar and bank account

  • Panels or inverters that do not meet the scheme's requirements. Subsidised home systems need domestically manufactured (DCR) panels.

  • Applying when the local transformer has no remaining solar capacity. The regulation caps rooftop solar at 50% of a transformer's or feeder's rated capacity.

Frequently asked questions

What is the maximum solar capacity allowed under net metering in Telangana?

Up to 500 kWp per consumer, limited to 100% of sanctioned load for homes and government buildings and 80% for commercial and industrial consumers.

How much is the net metering application fee in Telangana?

₹2,500 for low-tension consumers and ₹15,000 for high-tension consumers under the 2025 regulation.

What rate do I get for surplus solar power?

Surplus exports are settled at the lowest solar tariff discovered by the Telangana DISCOMs in the previous financial year, which is much lower than retail tariffs. Size your system to your own use.

Does a 5 kW home system need a feasibility study?

No. Systems up to 10 kWp do not need a technical feasibility study under the new regulation, although the DISCOM still checks your application.

Can a factory or office use net metering?

Yes, up to 80% of its sanctioned load and within the 500 kWp limit. Systems above 56 kWp need Chief Electrical Inspector certification. See commercial and industrial rooftop solar.

New to solar types? See how an on-grid solar system works compared with hybrid and off-grid.

Related guides

Let Arkasri handle the paperwork

Arkasri Energy designs and installs rooftop solar across Hyderabad and Telangana and coordinates the TGSPDCL net-metering application, inspection and, for homes, the PM Surya Ghar subsidy steps. Read our PM Surya Ghar guide, see rooftop solar for homes, or book a site assessment.

Based on the TGERC rooftop solar regulation that took effect on 15 November 2025 and published installer guidance, checked November 2026. Confirm current rules and fees with TGSPDCL before you apply.