Short answer: Under the TGERC Rooftop Solar PV Grid Interactive Systems Regulation, 2025 (in force since 15 November 2025), Telangana allows group net metering and virtual net metering. Group net metering lets one consumer share a rooftop system's output across their own multiple service connections; virtual net metering lets several consumers, such as apartment residents, share the output of one system. Both require a minimum system size of 10 kWp, apply to systems below 100 kWp, run within the same distribution licensee's area, and are valid for 25 years.

Four metering options in Telangana

  • Net metering: solar offsets consumption on the same connection (up to 500 kWp)

  • Gross metering: all solar output is sold to the DISCOM (up to 1 MWp)

  • Group net metering: one system's output is credited across multiple connections of the same consumer

  • Virtual net metering: one system's output is credited to several participating consumers

See net metering in Telangana for the standard process.

Group net metering

  • Suits a consumer with several connections, for example a school with multiple buildings, or a business with several meters

  • The "parent" connection hosts the rooftop system; surplus is allocated to the other connections

  • Allocation accounts for losses as set by the regulation and DISCOM procedure

  • Uses bi-directional smart meters

Virtual net metering

  • Suits apartment residents and others without a usable roof of their own

  • One system, often on a shared roof, credits participating consumers' bills

  • Uses a solar generation meter at the system

  • Participating consumers submit undertakings with the parent consumer's application

Key rules to know

  • Minimum size: 10 kWp for group and virtual net metering (1 kWp for net and gross metering)

  • Maximum: group and virtual net metering apply to systems below 100 kWp

  • Same DISCOM area: all participating connections must be with the same distribution licensee

  • No mixing: a consumer cannot combine net, group and virtual net metering

  • Arrears: consumers or participating connections with pending arrears are not eligible

  • Smart meters: all arrangements use smart meters with time-of-day capability

  • Validity: 25 years from grid connection

Based on the TGERC regulation and TGSPDCL implementation guidelines. Confirm current procedures with TGSPDCL before applying.

Who should consider these options

  • Gated communities and apartments where residents want to share one larger system. See solar for flat owners

  • Schools, colleges and hospitals with several connections on one campus. See school solar checklist

  • Businesses with a large roof on one building and load on another

Practical steps

  1. List all connections, their sanctioned loads and 12 months of bills

  2. Clear any pending arrears

  3. Agree allocation shares between participating connections

  4. Design a system of at least 10 kWp and below 100 kWp

  5. Submit the application with participating consumers' undertakings to TGSPDCL

Frequently asked questions

What is virtual net metering in Telangana?

An arrangement where one rooftop solar system's output is shared among several participating consumers' electricity bills.

What is the difference between group and virtual net metering?

Group net metering shares output across one consumer's multiple connections; virtual net metering shares it among different consumers.

What is the minimum size for group or virtual net metering?

10 kWp under the TGERC 2025 regulation.

Can apartment residents use virtual net metering?

Yes. It is designed for consumers without their own suitable roof, such as apartment residents, subject to DISCOM procedures.

Do all connections need to be with TGSPDCL?

All participating connections must be with the same distribution licensee.

Related guides

Plan a shared solar system with Arkasri

Arkasri Energy helps Hyderabad societies, campuses and businesses design systems for group or virtual net metering. See our apartment solar guide or book a site assessment.

Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026. Based on TGERC Regulation No. 1 of 2025 and TGSPDCL guidelines.