Short answer: In Andhra Pradesh, rooftop solar net metering is governed by APERC Regulation No. 4 of 2023 (amended in 2025), which allows net metering for systems up to 500 kWp. You apply to your DISCOM: APEPDCL (headquartered in Visakhapatnam), APCPDCL (Vijayawada) or APSPDCL (Tirupati). For homes under PM Surya Ghar, APERC has waived application fees and net metering charges for systems up to 10 kW, and in 2026 it allowed single-phase consumers to install up to 5 kW.

Who regulates and who connects you

  • APERC: the Andhra Pradesh Electricity Regulatory Commission sets the rooftop solar rules

  • APEPDCL: Eastern Power Distribution Company, headquartered in Visakhapatnam (north coastal AP)

  • APCPDCL: Central Power Distribution Corporation, headquartered in Vijayawada (central AP)

  • APSPDCL: Southern Power Distribution Company, headquartered in Tirupati (southern AP and Rayalaseema)

  • NREDCAP: the state renewable energy nodal agency

Your electricity bill shows which DISCOM serves you. The same APERC rules apply across all three.

Key rules in 2026

  • Capacity cap: net metering is available for rooftop systems up to 500 kWp under Regulation 4 of 2023. APERC clarified in June 2026 that older systems between 500 and 1,000 kWp commissioned before this regulation can continue under their earlier arrangements.

  • Fee waiver for homes: APERC waived application fees and net metering charges for domestic rooftop systems up to 10 kW under PM Surya Ghar.

  • Single-phase limit raised: in August 2026, APERC allowed single-phase consumers to install up to 5 kW, removing an earlier 3 kW restriction.

  • Group and virtual net metering: the regulation defines group net metering, relevant for owners with several connections.

Rules and orders change; confirm the latest APERC orders and your DISCOM's procedure before applying.

Step-by-step process for a home

  1. Check your bill: service number, DISCOM, phase and sanctioned load

  2. Site survey and design: roof space, shading and system size based on your units

  3. Apply on the PM Surya Ghar portal, selecting Andhra Pradesh and your DISCOM, if claiming the subsidy

  4. Feasibility approval from the DISCOM

  5. Installation by a registered vendor with ALMM-compliant DCR panels. See DCR vs non-DCR panels

  6. Inspection and net meter installation by the DISCOM

  7. Subsidy credit to your bank account after commissioning is approved

For businesses and institutions

  • Apply directly to the DISCOM under the APERC regulation

  • Size to daytime consumption and stay within the 500 kWp net-metering limit

  • Electrical inspectorate approvals apply to larger systems

  • Larger plants may suit open access or ground-mounted solar instead. See 1 MW solar plant feasibility

Telangana vs Andhra Pradesh at a glance

  • Regulator: TGERC in Telangana; APERC in Andhra Pradesh

  • Net metering cap: 500 kWp in both states under their current regulations

  • DISCOMs: TGSPDCL and TGNPDCL in Telangana; APEPDCL, APCPDCL and APSPDCL in AP

See net metering in Telangana for the Telangana process.

Frequently asked questions

What is the net metering limit in Andhra Pradesh?

Up to 500 kWp under APERC Regulation 4 of 2023, with older systems between 500 and 1,000 kWp allowed to continue under earlier arrangements.

Is there a net metering fee for homes in Andhra Pradesh?

APERC waived application fees and net metering charges for domestic rooftop systems up to 10 kW under PM Surya Ghar.

Can a single-phase connection install 5 kW solar in AP?

Yes. APERC's 2026 order allows single-phase consumers to install up to 5 kW.

Which DISCOM do I apply to in Andhra Pradesh?

The one on your electricity bill: APEPDCL, APCPDCL or APSPDCL.

Is the PM Surya Ghar subsidy available in Andhra Pradesh?

Yes, for eligible homes using approved DCR panels from a registered vendor, applied through the national portal.

Related guides

Rooftop solar in Andhra Pradesh with Arkasri

Arkasri Energy provides rooftop and ground-mounted solar EPC in Telangana and Andhra Pradesh. Contact us to confirm service in your area. See commercial solar or book a project assessment.

Written by the Arkasri Energy team. Reviewed November 2026. Based on APERC Regulation 4 of 2023 and APERC orders issued in 2025–2026; confirm current rules with APERC and your DISCOM.