Short answer: Before a school or college approves rooftop solar, it should check five things: daytime and holiday electricity use from 12 months of bills, roof condition and safe access away from students, the exact equipment and warranties in each proposal, who maintains the system after handover, and the net-metering and safety approvals. Schools use most of their power during the day, which suits solar, but long vacations reduce on-site use, so systems should be sized to term-time daytime load rather than roof area.

Why schools suit solar, and the holiday catch

  • Daytime use: classrooms, labs, computer rooms and fans run during school hours, when solar generates.

  • Large flat roofs: many campuses have RCC roofs with good sun exposure.

  • Holidays: during summer and festival vacations, consumption drops while solar keeps generating. Surplus exported at settlement earns a low rate under Telangana rules. See net metering in Telangana.

The fix is simple: size the system to term-time daytime load, and plan for summer camps, hostels or admin offices that use power in vacations.

The procurement checklist

1. Usage and sizing

  • 12 months of bills for every service connection on campus

  • Months with low use (vacations) clearly identified

  • Sanctioned load and category of each connection. See sanctioned load and solar capacity

  • Hostel, kitchen and sports facility loads that run in vacations

2. Roof and safety

  • Roof condition and waterproofing; fix leaks first. See rooftop solar and water leakage

  • Locked roof access, with no student access to panels or cables

  • Installation scheduled in holidays or after school hours

  • Inverters and distribution boxes placed in secured, ventilated rooms

3. Equipment in each proposal

  • Panel make, model, wattage and ALMM/DCR status. See DCR vs non-DCR panels

  • Inverter make, model and capacity

  • Structure material, height and wind design

  • Protection: ACDB, DCDB, surge protection, earthing and lightning arrester

4. Warranties and maintenance

  • Panel product and performance warranties, inverter warranty, workmanship warranty

  • Cleaning frequency and who does it

  • Remote monitoring access for the school's facilities staff

  • Breakdown response time and annual maintenance cost

5. Approvals and paperwork

  • TGSPDCL net-metering application and inspection

  • Chief Electrical Inspector certification for systems above 56 kWp

  • Management or trust board approval, with a written summary of cost, savings and responsibilities

6. Commercial terms

  • Full price with GST, payment milestones and exclusions

  • CAPEX or OPEX model. See CAPEX vs OPEX vs RESCO

  • Savings estimate showing self-use and holiday assumptions. See solar payback

Using solar as a learning resource

A monitoring display in the lobby or science lab lets students see live generation and how weather affects output. This adds educational value without changing the system design.

Frequently asked questions

Is rooftop solar worth it for schools?

Usually, because schools use most of their electricity during the day. Savings are best when the system is sized to term-time daytime load.

What happens to solar power during school holidays?

Generation continues while use drops, so more power is exported. Surplus at settlement earns a low rate, which is why sizing to term-time load matters.

Is rooftop solar safe on a school building?

Yes, when roof access is locked, equipment is in secured rooms, and the system has proper earthing and protection devices.

Who should maintain a school's solar system?

Usually the installer under an annual maintenance contract, with monitoring access for the school's facilities staff.

What documents does a school need for net metering?

The electricity bill, ownership or lease proof, management authorisation and the installer's technical documents, submitted to TGSPDCL.

Related guides

Plan campus solar with Arkasri

Arkasri Energy designs rooftop solar for schools and colleges across Hyderabad and Telangana, sized to term-time load and installed outside teaching hours. See solar for schools or book a site assessment.

Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026.