Short answer: A rooftop solar site survey confirms whether the system in your estimate will actually fit and work on your building. The installer should check usable roof area, shading through the day, roof type and condition, structure height, cable route to the inverter and meter, your electricity connection and sanctioned load, earthing locations and safe access for cleaning. In Hyderabad, a survey usually takes under an hour for a home and should end with a written, itemised quotation.
Why a site survey matters
Online calculators and phone estimates work from your bill. Only a visit can confirm what is on your roof: water tanks, staircase rooms, parapet height, neighbouring buildings, trees and existing pipes. A quote made without a survey can change later, which is one reason two quotes for the same home differ. See how to compare two solar quotations fairly.
What a site survey checks
1. Usable roof area and layout
Total terrace area and the part free of tanks, staircase rooms and solar water heaters
Space for walkways so panels can be cleaned and serviced
Panel orientation; in Hyderabad, panels generally face south for best annual output
How many panels of the chosen wattage fit. See how much roof area solar needs
2. Shading
Shadows from water tanks, parapets, lift rooms, trees and taller neighbouring buildings
How shadows move between morning and evening, and between summer and winter
Whether shaded areas should be left empty; even partial shade on one panel can reduce a string's output
3. Roof type and condition
RCC slab, metal sheet or tiled roof
Existing cracks, leaks or waterproofing that should be fixed before installation
Planned future work on the terrace, such as an extra floor
4. Mounting structure height
Low structure or elevated structure that keeps the terrace usable
Wind exposure based on building height and surroundings
Fixing method suited to the roof
5. Electrical connection
Sanctioned load and phase (single or three-phase) from your bill. Read sanctioned load and solar capacity
Meter location and main distribution board condition
Inverter location: shaded, ventilated, protected from rain and close to the board
Cable route from roof to inverter to meter
6. Earthing and protection
Locations for earthing pits
Whether a lightning arrester is needed for the building height and surroundings
7. Access and safety
Safe access to the roof for installation and future cleaning
Water point for cleaning
Ladder or staircase arrangements
8. Your consumption and goals
12 months of electricity bills
Daytime vs night-time use, planned AC or EV additions
Whether backup is needed (hybrid with battery). See on-grid vs hybrid solar
What to keep ready before the survey
Last 12 months of electricity bills: Sizing the system to actual use
Latest bill with USC number: Sanctioned load, phase and category
Roof access: Measurements and shading check
Property ownership proof: Needed later for net metering and subsidy
Society/RWA permission (flats): Roof rights in shared buildings
List of planned new appliances: Avoids under-sizing
What you should receive after the survey
Recommended system size (kWp) and the reasoning
A roof layout showing panel placement
An itemised quotation: panels, inverter, structure, cabling, protection, paperwork, GST and warranty
Estimated annual generation with its assumptions
Timeline for net metering and, for homes, the PM Surya Ghar subsidy steps
Frequently asked questions
How long does a rooftop solar site survey take?
For most homes, under an hour on site. Larger commercial roofs can take longer and may need a structural check.
Is a site survey necessary before getting a solar quote?
For a final quote, yes. Roof space, shading, structure height and cable routes can only be confirmed on site.
Which direction should solar panels face in Hyderabad?
Generally south, with a tilt suited to Hyderabad's latitude. The survey confirms what the roof allows.
Does shading from a water tank matter?
Yes. Shade on part of a panel can reduce the output of a whole string, so shaded areas are usually left empty or designed around.
What documents should I keep ready for a solar survey?
Recent electricity bills with your USC number, and for flats, permission from the society or RWA.
Not sure your terrace is big enough? See how much roof space you need for solar panels — a kW-by-kW table in sq ft and m², plus a quick calculator.
Related guides
Will Solar Work on a Shaded Rooftop in Hyderabad? Layout, Optimisers and Trade-offs
Best Solar Panel Tilt Angle and Direction for Hyderabad Rooftops
Rooftop Solar Installation Quality Checklist for Hyderabad Homes and Businesses
How to Choose a Solar Company in Hyderabad: A 12-Point Checklist
Solar for Villas in Hyderabad Gated Communities: Association Rules and Approvals
Rooftop Solar for Independent Houses in Hyderabad: Size, Cost and Roof Planning
Start here: Hyderabad rooftop solar buyer's guide
Book a site survey with Arkasri
Arkasri Energy is based in Tellapur and surveys homes, villas, apartments and businesses across Hyderabad, including Tellapur, Nallagandla, Gachibowli, Kollur and Patancheru. See rooftop solar for homes or book a site assessment.
Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026.