Short answer: A rooftop solar site survey confirms whether the system in your estimate will actually fit and work on your building. The installer should check usable roof area, shading through the day, roof type and condition, structure height, cable route to the inverter and meter, your electricity connection and sanctioned load, earthing locations and safe access for cleaning. In Hyderabad, a survey usually takes under an hour for a home and should end with a written, itemised quotation.

Why a site survey matters

Online calculators and phone estimates work from your bill. Only a visit can confirm what is on your roof: water tanks, staircase rooms, parapet height, neighbouring buildings, trees and existing pipes. A quote made without a survey can change later, which is one reason two quotes for the same home differ. See how to compare two solar quotations fairly.

What a site survey checks

1. Usable roof area and layout

  • Total terrace area and the part free of tanks, staircase rooms and solar water heaters

  • Space for walkways so panels can be cleaned and serviced

  • Panel orientation; in Hyderabad, panels generally face south for best annual output

  • How many panels of the chosen wattage fit. See how much roof area solar needs

2. Shading

  • Shadows from water tanks, parapets, lift rooms, trees and taller neighbouring buildings

  • How shadows move between morning and evening, and between summer and winter

  • Whether shaded areas should be left empty; even partial shade on one panel can reduce a string's output

3. Roof type and condition

  • RCC slab, metal sheet or tiled roof

  • Existing cracks, leaks or waterproofing that should be fixed before installation

  • Planned future work on the terrace, such as an extra floor

4. Mounting structure height

  • Low structure or elevated structure that keeps the terrace usable

  • Wind exposure based on building height and surroundings

  • Fixing method suited to the roof

5. Electrical connection

  • Sanctioned load and phase (single or three-phase) from your bill. Read sanctioned load and solar capacity

  • Meter location and main distribution board condition

  • Inverter location: shaded, ventilated, protected from rain and close to the board

  • Cable route from roof to inverter to meter

6. Earthing and protection

  • Locations for earthing pits

  • Whether a lightning arrester is needed for the building height and surroundings

7. Access and safety

  • Safe access to the roof for installation and future cleaning

  • Water point for cleaning

  • Ladder or staircase arrangements

8. Your consumption and goals

  • 12 months of electricity bills

  • Daytime vs night-time use, planned AC or EV additions

  • Whether backup is needed (hybrid with battery). See on-grid vs hybrid solar

What to keep ready before the survey

  • Last 12 months of electricity bills: Sizing the system to actual use

  • Latest bill with USC number: Sanctioned load, phase and category

  • Roof access: Measurements and shading check

  • Property ownership proof: Needed later for net metering and subsidy

  • Society/RWA permission (flats): Roof rights in shared buildings

  • List of planned new appliances: Avoids under-sizing

What you should receive after the survey

  • Recommended system size (kWp) and the reasoning

  • A roof layout showing panel placement

  • An itemised quotation: panels, inverter, structure, cabling, protection, paperwork, GST and warranty

  • Estimated annual generation with its assumptions

  • Timeline for net metering and, for homes, the PM Surya Ghar subsidy steps

Frequently asked questions

How long does a rooftop solar site survey take?

For most homes, under an hour on site. Larger commercial roofs can take longer and may need a structural check.

Is a site survey necessary before getting a solar quote?

For a final quote, yes. Roof space, shading, structure height and cable routes can only be confirmed on site.

Which direction should solar panels face in Hyderabad?

Generally south, with a tilt suited to Hyderabad's latitude. The survey confirms what the roof allows.

Does shading from a water tank matter?

Yes. Shade on part of a panel can reduce the output of a whole string, so shaded areas are usually left empty or designed around.

What documents should I keep ready for a solar survey?

Recent electricity bills with your USC number, and for flats, permission from the society or RWA.

Not sure your terrace is big enough? See how much roof space you need for solar panels — a kW-by-kW table in sq ft and m², plus a quick calculator.

Related guides

Book a site survey with Arkasri

Arkasri Energy is based in Tellapur and surveys homes, villas, apartments and businesses across Hyderabad, including Tellapur, Nallagandla, Gachibowli, Kollur and Patancheru. See rooftop solar for homes or book a site assessment.

Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026.