Short answer: In Telangana, your sanctioned (contracted) load limits the rooftop solar capacity you can connect under net metering. Under the TGERC rooftop solar regulation in force since 15 November 2025, homes and government buildings can install up to 100% of their sanctioned load and commercial, industrial and other consumers up to 80%, within an overall 500 kWp limit. Find the sanctioned load on your TGSPDCL bill; if it is lower than the solar size you need, apply for a load enhancement before the solar application.
What is sanctioned load?
Sanctioned load (also called contracted or connected load) is the maximum electrical load, in kW, that the DISCOM has approved for your service connection. It is printed on your electricity bill next to your USC number and category.
It is not the same as how much electricity you use. A home may use 600 units a month on a 3 kW sanctioned load, or 300 units on a 5 kW sanctioned load.
How sanctioned load limits solar size
Domestic (homes, villas): Up to 100% of sanctioned load
Government: Up to 100% of sanctioned load
Commercial, industrial and others: Up to 80% of sanctioned load
Overall cap per consumer: 500 kWp (net metering)
Source: TGERC rooftop solar regulation effective 15 November 2025. Confirm current limits with TGSPDCL before you apply.
Example: a villa with a 4 kW sanctioned load cannot connect a 5 kW system until the load is enhanced to at least 5 kW. A factory with a 100 kW sanctioned load can connect up to 80 kW.
Step-by-step: what to check first
Find your sanctioned load on the latest bill.
Work out the solar size you need from 12 months of units, not from roof area. Our guide to how many units solar generates in Hyderabad helps.
Compare the two. If the solar size is within the limit, you can go ahead. If not, apply for a load enhancement first.
Check the connection phase. Larger systems normally need a three-phase connection; your installer and TGSPDCL will confirm what your connection supports.
Check roof space for the chosen size. See how much roof area solar needs.
Single-phase or three-phase connection?
Single-phase connections suit smaller home systems and use a single-phase inverter.
Three-phase connections suit larger homes, villas with heavy air-conditioning, and almost all commercial sites, and use a three-phase inverter.
The inverter must match your connection. If you plan to change from single-phase to three-phase, do it before the solar design is finalised, because it changes the inverter and the application.
When you need a load enhancement
You may need to increase your sanctioned load if:
The solar system you need is larger than your current sanctioned load
You have added air conditioners, an EV charger or a lift since the connection was given
You are moving from single-phase to three-phase
Apply to TGSPDCL for the enhancement, pay the applicable charges and wait for the bill to show the new sanctioned load before submitting the solar or PM Surya Ghar application. A mismatch between the requested solar size and the sanctioned load is one of the common reasons applications are held up.
Other limits that can affect approval
Transformer capacity: the regulation caps rooftop solar at 50% of a distribution transformer's or feeder's rated capacity. If your local transformer is full, approval may be delayed.
Feasibility study: systems up to 10 kWp do not need a technical feasibility study.
Electrical inspector certification: systems above 56 kWp need certification by the Chief Electrical Inspector.
Full details are in our guide to net metering in Telangana.
Frequently asked questions
Can I install solar larger than my sanctioned load in Telangana?
Not under net metering. Homes can install up to 100% of sanctioned load and commercial or industrial consumers up to 80%. Apply for a load enhancement first if you need more.
Where do I find my sanctioned load?
It is printed on your TGSPDCL electricity bill, near your service connection (USC) number and consumer category.
Does sanctioned load decide how much electricity I can use?
No. It is the maximum load approved for your connection. Your monthly units depend on how you use electricity.
Do I need a three-phase connection for rooftop solar?
Smaller home systems can run on single-phase. Larger homes and most businesses use three-phase. Your installer and TGSPDCL confirm what your connection supports.
Should I size solar to my sanctioned load or my bill?
To your bill. The sanctioned load is a ceiling; the right size comes from the units you actually use, because surplus exports earn a low rate.
Not sure your terrace is big enough? See how much roof space you need for solar panels — a kW-by-kW table in sq ft and m², plus a quick calculator.
Related guides
Can I Expand My Existing Solar System in Hyderabad? Capacity, Approvals and Subsidy
Rooftop Solar for a Home With ACs and an Electric Car: How to Size It
End-to-End Solar in Hyderabad: Who Handles Each Stage, From Survey to Handover
Group Net Metering and Virtual Net Metering in Telangana: How They Work (2026)
What Size Solar System Do I Need for My Hyderabad Electricity Bill?
Start here: Hyderabad rooftop solar buyer's guide
Not sure what your connection allows?
Send Arkasri Energy a photo of your latest electricity bill. We will check your sanctioned load, connection phase and consumption, then advise the right system size and whether a load enhancement is needed. See rooftop solar for homes, commercial and industrial solar, or book a site assessment.
Written by the Arkasri Energy team, Tellapur, Hyderabad. Reviewed November 2026. Based on the TGERC rooftop solar regulation effective 15 November 2025; confirm current rules with TGSPDCL.